首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   41篇
  免费   0篇
  国内免费   1篇
安全科学   2篇
废物处理   6篇
环保管理   1篇
综合类   1篇
基础理论   10篇
污染及防治   20篇
评价与监测   1篇
社会与环境   1篇
  2023年   2篇
  2022年   1篇
  2021年   1篇
  2018年   1篇
  2016年   1篇
  2015年   1篇
  2014年   2篇
  2013年   5篇
  2012年   1篇
  2011年   1篇
  2010年   2篇
  2009年   4篇
  2008年   2篇
  2007年   8篇
  2004年   1篇
  2003年   2篇
  1998年   1篇
  1993年   1篇
  1979年   1篇
  1978年   1篇
  1977年   1篇
  1975年   2篇
排序方式: 共有42条查询结果,搜索用时 78 毫秒
41.
Journal of Material Cycles and Waste Management - The situation of health-care waste in the Gaza Strip was threatening the environment and the public health due to the absence of appropriate...  相似文献   
42.

Gaza Strip is considered as one of the armed conflicts prone areas in Middle East. Several intensive conflicts occurred in Gaza Strip in 2008, 2012, 2014 and 2021. These conflicts caused massive destroying the infrastructures, facilities, and buildings, which affected all services and activities in Gaza Strip. One of the major post-conflict issues in Gaza strip is the management of resulted demolition waste including its removal, sorting, recycling, and material recovery. In May 2021, over than 370,000 tons of demolition waste composed of rubbles and debris was generated during 11 days of armed conflict. The accumulated previous experience of rubbles and debris removal and recycling in Gaza Strip supported to perform a quick management approach for safe removal of the post-conflict demolition waste and reuse/recycle the resulted waste materials in various applications. The sorting and transporting process of concreate and non-concreate rubble elements of the waste were carried out in cooperation between local and international agencies as emergency recovery-funded projects. The most proportion of rubbles are concrete aggregates, thus, the material recovery was conducted through crushing process for concrete rubbles and then reusing it for road rehabilitation or producing concrete building blocks. The large concrete blocks reused to be placed for shoreline protection for specific area along Gaza beach. The recycling of post-conflict demolition waste management projects in Gaza Strip brought economic and social benefits through the reuse and recycle of resources and creation of job opportunities. In conclusion, although the post-conflict demolition waste management is quite different from municipal/industrial waste management in Gaza Strip, it is conducted through applying similar techniques of disaster waste management in waste removal, and those of construction and demolition (C&D) waste management in sorting, crushing, and sieving for recycling.

  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号